Construction Projects

August, 2011

Harmon Enterprises Construction Roofing Bozeman MT
This fantastic old home in the historical district of Bozeman was in need of a new roof after it was damaged by hail. We removed the old asphalt roofing and installed new architectural asphalt roofing. We installed new galvanized hip and ridge metal as well as new finials to accent the classic lines of the roof.        
 

July, 2011

framing, stairs, willow creek, harmon enterprises construction
We rebuilt this exterior staircase in Willow Creek to make it safe, sturdy and up to current building codes. Properly flashing the new landing at the ledger board connection to the building will prevent future water damage like the rotten siding and joists that we repaired. The second lower handrail was added to make it easier for small children to use the stairway. We also installed new tuf-rib roofing with a galvalume finish on the gambrel roof. We freshened up the exterior with a new coat of stain for the siding and painted the trim.
 
Bozeman Roofing Hail damage Harmon Enterprises construction
This classic gambrel roof home in Bozeman Montana suffered damage in a severe hail storm and needed a new roof. We removed the existing cedar roofing on both the house and the detached garage, installed plywood sheathing over the board sheathing, applied ice and water shield and synthetic underlayment to meet roofing code and installed 50 year Malarkey Legacy shingles in weathered wood color.                  
 

June, 2011

Harmon Enterprises Construction Bozeman MT Roofing Spruce
After the hail storm in the late summer of 2010 Bozeman Montana and the surrounding areas suffered a massive amount of storm damage. The Spruce Meadow Community had to have all new roofing installed because of hail damage. We installed new roofing on 22 buildings (44 units) at Spruce Meadows. The shingles we installed are Malarkey Highlander-CS architectural asphalt shingles in weathered wood color.            
 

May, 2011

Bozeman MT re-roof dried in titanium underlyament Harmon Enterprises Constuction Inc
This two story four-plex in Bozeman was one of two identical buildings that we installed roofing on in the spring of 2011. The shingles we installed are Timberline by GAF.      
 

April, 2011

Bozeman MT re-roof dried in titanium underlyament Harmon Enterprises Constuction Inc
This two story four-plex is pictured when the roof was stocked and ready to insall new shingles. We installed Timberline 30 year architectural asphalt shingles in Barkwood color.      
 

March, 2011

tuf-rib roof amsterdam mt harmon enterprises construction inc
The T-lock shingles on this family farmhouse and outbuildings in Amsterdam were showing a lot of wear and the roofing was in need of replacement. We removed the old roofing, installed plywood sheathing and dry-in and tuf-rib metal from Bridger Steel in Belgrade.
 

October, 2010

Metal lap siding new roofing paint Bozeman MT Harmon Enterprises Construction
We removed the cedar siding on this home in Bozeman because it had started to warp and twist. We installed Tyvek house wrap and new metal lap siding with metal corners and trim. We also installed new architectural asphalt roofing. The existing cedar fascia was freshened up with a new coat of dark brown paint. A bright blue paint was chosen by the owners to contrast the front entry door and garage door with the new red siding.
 

September, 2010

LP lap siding Bozeman MT Harmon Enterprises Construction
The Granite Peak Condos in Bozeman Montana suffered severe hail damage to their vinyl siding and roof. We removed the old siding and installed new Miratec trim on the corners and around the doors and winows. The LP lap siding comes pre-finished. The siding color the clients chose was Acadia and we painted the trim white. We also installed new asphalt shingles on the roof.   
 

July, 2010

Manhattan MT Re-Roof Malarkey Harmon Enterprises
This farmhouse on the outskirts of Manhattan Montana was one of five roofing projects that we completed for the same owners in 2010 and 2011. The roof had to be sheathed with plywood to give us a solid surface to install the ice and water shield and new architectural asphalt shingles.    
 

Pages