Belgrade dining room addition

Dining Room Addition Belgrade

February, 2017

This is a residential dining room addition that we built in Belgrade, Montana. We managed all aspects of the project - from excavation and concrete to the final interior and exterior finishes.


  • Forms are set and Mundt Construction is ready to pour the walls for the addition.

  • The concrete boom truck gets ready to pour the foundation walls.

  • The boom truck reaches over the house to pour concrete for the back yard addition.

  • The new crawl space is insulated and a vapor barrier is installed.

  • Rough framing is complete, the building is dried-in and Nano Electrical is working on the rough-in for can lights.

  • Rough framing for new steps and landing to exit the back door of the addition.

  • A landing for a second back door exit is rough framed and decked.